Documents to gather
What helps Coastline understand a project. The app marks each one as have it, will get it or not available.

Floor plans or drawings
Show where the work is and how big the space is.
Landlord work letter or tenant criteria
Say what the landlord provides and allows in the space.
For: tenant build-out
Photos of panel directories and nameplates
Show the existing panels, their ratings and circuits.
12 months of electric bills with peak demand
Give the measured peak the capacity check starts from.
Equipment cut sheets or nameplates
Give the ratings of the equipment to be added.
One-line diagram
Shows how the service, transformers and panels connect.
Inspection or survey reports
List the items to correct.
For: code corrections, maintenance and modernization
Building access rules and hours
Say when and how the work can be done in the building.
Nothing is attached by the app or this site: send the files from your own email app.
Have a commercial project coming up?
Call (508) 262-6496 or email sales@coastlinees.com, Monday to Friday 8:00 AM – 5:00 PM. Or put the scope together first with the Scope Planner.